At TAG GROUP We believe that a strong safety culture is essential for success and wellbeing and continually strive to maintain the safest possible work environments on every project. We are committed to providing a safe and secure environment for our people through regular training, risk assessments, and a proactive approach to safety. We aim to minimise risks and protect our team, clients, and the communities we serve.
At TAG GROUP, reliability is at the core of everything we do. Our fleet of specialised plant is maintained to the highest standards, ensuring it’s always safe, ready, and fully compliant for every project we engage with. We proudly maintain our plant in-house, ensuring our fleet is always ready and compliant giving our clients the confidence that their projects will run smoothly, on time, and without compromise.
TAG GROUP’s capability is built on a foundation of industry leaders with years of on the ground Industry experience. We have the capacity to handle projects of any scale, from rail maintenance to large infrastructure developments. Our extensive fleet and highly trained workforce allow us to adapt to the unique requirements of each job, ensuring the highest standards of quality, safety, and efficiency.
TAG installed ‘eye brows’ to protect the overhead wiring and the general public from above. Installing these coverings provide security and protection for the networks most valuable assets.
TAG was engaged to install new signal cages on an existing structure to make room for a new rail line. Due to the narrow width of the corridor, the existing structure was re purposed to accommodate additional signals.
TAG was engaged to remove redundant gantries on the ARTC lines, making room for new trains and carriages when the full project is completed
TAG conducted Non-Destructive Digging on sensitive rail assets, protecting them before piling was conducted in the same area.
TAG were engaged to install new overhead signalling gantries for the installation of new tracks in the Dandenong stabling yards.
TAG were privileged enough to be engaged to remove a heritage listed signal gantry at Wangaratta, VIC. The gantry and signalling gear was removed with extreme care, under the watchful eye of Heritage Victoria, then transported to Yarra Glen where it will be refurbished and displayed.
TAG is contracted with Sydney Trains (Transport NSW) to supply wet hire plant and equipment. We perform maintenance on the network daily and during shut downs.
TAG was contracted to SPA, to work in the MURL. Our works included the install of a hoist in one of the Air Vents (shafts) to lower and retrieve materials for upcoming works.
TAG was engaged to renew gantries for track duplication for improved services on the VLINE network in Gippsland